To the Title Office that is.
Will post more tonight on how that went, along with our settlement demonstration at 1PM.
Later!
Thursday, December 29, 2011
Monday, December 26, 2011
Counting Down Hours Now.
So here we are at signing week. Allegedly Thursday at 9 AM, we are to be at the Title Office to sign for our house. I say allegedly because until we are there, I am of the mindset that things could go wrong, and we will be delayed. So we will see.
Today the cleaners were there, and tomorrow our PM said he will have workers there all day for last minute fixes. Seems kind of counter-intuitive to have the cleaners come in while there is still some(in my eyes) some rather big fixes, but I will keep the faith that it will all come together. For my money, they can keep working until our walk-through at 1 PM Thursday.
So today I took some pictures of our almost-finished product, and here they are.
| 5 ft shower instead of tub. |
| Still loose exhaust fan. |
| MBR closet. |
| Master Bedroom |
| Looking down hall from MBR. |
| 4th bedroom/Multi-purpose room. |
| Daughters Room. |
| Guest Room |
| Daughters/Guest Bathroom |
| Laundry Room |
| Full railing instead of capped wall. |
| Railing going upstairs. |
| Entering front door. |
| We will make this a living room. |
| Foyer |
| Family Room from Kitchen. |
| Kitchen from Family Room. |
| Morning Room from Kitchen. |
| Kitchen from Morning Room. |
| Top of stairs to ManCave |
| Stairs to ManCave |
| Basement 1/2 Bath |
| Office Area |
| Looking towards Entertainment Area |
| More of Entertainment Area |
| Laundry Tub in unfinished area. |
| Rest of unfinished area. |
So you can see there are a couple things that still need attention. The Master Bath exhaust fan, and the carpet in the office area where they had to cut to access the drain. The hole in the ceiling in that area is where they have to put an access cover for the hose bib shut off. That didn't get cut out when they drywalled. I also discovered today that there IS a floor heating/cooling vent in the powder room, but it got tiled over and never cut out.
And just for the sake of full disclosure, when I was taking pictures today, somehow I forgot to take some of the Foyer area, so the ones I included are ones from a previous visit.
Saturday, December 24, 2011
Friday, December 23, 2011
"On A Cold Ohio Morning, Everything Is Gray"...
..."And there you are, bringing back some sunshine".
Well in this case the sunshine is metaphorical, but it was a good feeling to see our house with all its exterior trappings in place. Our "winter" landscaping grade is done, along with the driveway and walk that will have to do until spring. Getting up that gravel and into the garage may be a bit of a challenge when the snow and ice come, but we will see.
Interior-wise everything is coming together. For the past few days the drywallers have been there doing the rough finish in the garage, and all the places inside that needed attention. The carpeting in our daughters room was pulled up to isolate a floor squeak and is back in place, but I think it needs secured a little better around the baseboards.
A plumber was there a couple days and had all the toilets up and it looked like all my drains were getting colonoscopies, since they had things running down them. There must have been some sort of issue, as they had to cut the carpet in the basement to get to the drain pipe in the floor. Have to find out what that was about.
The window they have to replace is in the garage, along with the cabinet door face, and drawer on the island that needed replaced.
The painters need to come back and do some touch-up work, and the one thing that needs done that is catching my eye is at the front door. There is a piece of quarter-round where the wood laminate meets the door frame that has nails is it, but lifts right up. I also noticed light coming around the the door when its closed, with a nice little draft playing accompaniment. I don't know if the remedy for that is insulating felt, or they adjust the frame...
All-in-all I am comfortable where we are in relation to our tentative close on Thursday. Our PM says the cleaning crew will be in Monday, and then his workers will probably be there all day Tuesday catching the last-minute stuff. He said the final inspection is scheduled, which I assume is on Wednesday.
Hope everyone has a Merry Christmas if you choose to recognize the holiday. But if you prefer another variation of the season, enjoy that too.
Well in this case the sunshine is metaphorical, but it was a good feeling to see our house with all its exterior trappings in place. Our "winter" landscaping grade is done, along with the driveway and walk that will have to do until spring. Getting up that gravel and into the garage may be a bit of a challenge when the snow and ice come, but we will see.
Interior-wise everything is coming together. For the past few days the drywallers have been there doing the rough finish in the garage, and all the places inside that needed attention. The carpeting in our daughters room was pulled up to isolate a floor squeak and is back in place, but I think it needs secured a little better around the baseboards.
A plumber was there a couple days and had all the toilets up and it looked like all my drains were getting colonoscopies, since they had things running down them. There must have been some sort of issue, as they had to cut the carpet in the basement to get to the drain pipe in the floor. Have to find out what that was about.
The window they have to replace is in the garage, along with the cabinet door face, and drawer on the island that needed replaced.
The painters need to come back and do some touch-up work, and the one thing that needs done that is catching my eye is at the front door. There is a piece of quarter-round where the wood laminate meets the door frame that has nails is it, but lifts right up. I also noticed light coming around the the door when its closed, with a nice little draft playing accompaniment. I don't know if the remedy for that is insulating felt, or they adjust the frame...
All-in-all I am comfortable where we are in relation to our tentative close on Thursday. Our PM says the cleaning crew will be in Monday, and then his workers will probably be there all day Tuesday catching the last-minute stuff. He said the final inspection is scheduled, which I assume is on Wednesday.
Hope everyone has a Merry Christmas if you choose to recognize the holiday. But if you prefer another variation of the season, enjoy that too.
Sunday, December 18, 2011
And Coming Down The Stretch It's...
So here we are 11 days before close, and things are almost finished. It looks like its down to touch-ups, setting some appliances, getting utilities on, and inspections.
We got the key from the sales rep a few hours ago and went through taking pictures and making notes. There are more pictures to share, but its time to head out for a family Christmas party so I will post these for juxtaposition.
The spray-painted spot on the front is where the address stone is going. Somehow we still got the numbers on the side of the garage...thinking about keeping them.
We got the key from the sales rep a few hours ago and went through taking pictures and making notes. There are more pictures to share, but its time to head out for a family Christmas party so I will post these for juxtaposition.
| October 4, 2011 |
| December 18, 2011 |
The spray-painted spot on the front is where the address stone is going. Somehow we still got the numbers on the side of the garage...thinking about keeping them.
Monday, December 12, 2011
I didn't ask for THIS upgrade!!
My wife stopped by during her lunch break today, and took this picture. Obviously, the plumbers were in today. Also the electricians, and the stone guys were back. I stopped by after work and the stone guys were wrapping up, the electrician was gone, and the plumber was still there.
It looks like all the electric has been done, and they did unearth our hidden plug on our wall going into the family room. From the looks of it, they misjudged their initial attempt, so some drywall repair is needed. All the lights are in, up to and including the infamous "boobalier". All the plugs and switches, and our outdoor plugs and lights.
The plumber had most of his work done, except for two toilets, and the actual hooking up of the lines.
The garbage disposal was in, and our over-the-range microwave was installed. The stove and dishwasher were still in boxes in the morning room. This is probably a stupid question, but does the laminate flooring get put in before they set those, or will they go before the flooring?
We ordered an address stone, but that wasn't put in nor was there a place left out for it on the front of the house. I assume when it comes they will have to use some sort of stone cutting apparatus to cut out a place for it? Any input here would be appreciated also.
The window treatment measure will take place tomorrow, so I am looking forward to seeing what will happen. Better pictures tomorrow, the one above was a cell phone pic.
I did get a call from our loan officer tonight, and we talked about VA appraisals. I guess they can't be ordered until the home is 95% complete, and then there is about a 7-10 day wait for it to be done. So basically the call was to see if need be, could we close the first week in January. He said that he has never had one cause a closing delay, but there are 4 VA loans closing from his office at the end of the month, and he was told by his boss to call everyone and let them know what might happen. The only real problem a weeks delay would cause is with our refrigerator delivery, which can be rescheduled if need be.
So we will see.
Sunday, December 11, 2011
Another Lost Weekend
Well, not really I guess...we did finish our Christmas shopping.
House-wise, wasn't as much action as I would have hoped.
I know there are only so many "nice" days left here in Northeast Ohio, and I hate to see one go by when there is stuff that could be accomplished on our exterior, and that needs done. Our shake siding has yet to arrive on-site, so I guess that part can't be helped.
A stone guy prepped on Friday(afternoon), and on Saturday they got in front of the garage done, the side of the garage on the porch, and about 1/4th of the way on the house front itself. Today there was nothing done. I see as of right now there is only one day of rain on the forecast for Thursday, so maybe I am overreacting, but with closing coming up fast and a good portion of interior work to be done, also the aforementioned Christmas coming...
We have gotten all the doors painted and re-hung, the sills and baseboards filled and sanded and ceiling/wall painting done. I guess I should check to see if there will be more coats applied or just touch-ups if needed. Any input here would be appreciated. The hardware was put on the doors, along with the springy door stops...got tired of that "sproing" noise real fast as my daughter went though the house. I checked each door to make sure it closed and there were only two that didn't, but the hinge pins were not all the way in, so maybe that was the cause. Also our coat closet door in the foyer, and master bath door have brass hinges, while all the others are nickel.
We did go to Lowe's last night to set up an appointment to get our windows measured for blinds, and a panel-track shade for the slider. Apparently the installer will call me to set up the appt and then send the measurements to the store once he takes them and they will get with me for our choices. I think a step or two could be eliminated there for efficiency's sake.
Until next time here are some various and sundry pictures.
House-wise, wasn't as much action as I would have hoped.
I know there are only so many "nice" days left here in Northeast Ohio, and I hate to see one go by when there is stuff that could be accomplished on our exterior, and that needs done. Our shake siding has yet to arrive on-site, so I guess that part can't be helped.
A stone guy prepped on Friday(afternoon), and on Saturday they got in front of the garage done, the side of the garage on the porch, and about 1/4th of the way on the house front itself. Today there was nothing done. I see as of right now there is only one day of rain on the forecast for Thursday, so maybe I am overreacting, but with closing coming up fast and a good portion of interior work to be done, also the aforementioned Christmas coming...
We have gotten all the doors painted and re-hung, the sills and baseboards filled and sanded and ceiling/wall painting done. I guess I should check to see if there will be more coats applied or just touch-ups if needed. Any input here would be appreciated. The hardware was put on the doors, along with the springy door stops...got tired of that "sproing" noise real fast as my daughter went though the house. I checked each door to make sure it closed and there were only two that didn't, but the hinge pins were not all the way in, so maybe that was the cause. Also our coat closet door in the foyer, and master bath door have brass hinges, while all the others are nickel.
We did go to Lowe's last night to set up an appointment to get our windows measured for blinds, and a panel-track shade for the slider. Apparently the installer will call me to set up the appt and then send the measurements to the store once he takes them and they will get with me for our choices. I think a step or two could be eliminated there for efficiency's sake.
Until next time here are some various and sundry pictures.